Vitkalov Vladimir Ivanovich
Chief Power Engineer. Included in the NOPRIZ and NOSTROY registers. Implemented a 50 MW energy complex for Gazprom.
Power engineer with many years of successful experience working with instrumentation and control systems and industrial electronics.
5th group in electrical safety.
Included in the NOPRIZ and NOSTROY registers.
Design, construction, and operation of engineering networks and equipment.
Area of operated facilities up to 60,000 m².
Completed energy complex projects:
Autonomous energy complex for AGD Diamonds (Arkhangelsk Oblast)
Design of a gas-piston power plant complex with a total installed capacity of 20 MW.
Developed and approved the GPZU. Design of the power generation facility.
Autonomous energy complex for JSC Gazstroyprom (Sakhalin Oblast)
Pre-design solution for a 10 MW gas-piston power plant energy complex.
Energy complex for Gazprom Dobycha Orenburg LLC (Arkhangelsk Oblast)
Project for backup power supply of diesel power stations with an installed capacity of 50 MW, equipment installation, commissioning, preparation of as-built documentation, project management.
Project of a 110 kV transformer substation, construction, project management.
Project for the reconstruction of a 25 MW gas boiler house, including thermal generation, design of electrical/heat/water supply, ventilation, and air conditioning sections. Obtaining technical conditions, project approvals. Equipment installation, commissioning, preparation of as-built documentation.
5th group in electrical safety.
Included in the NOPRIZ and NOSTROY registers.
Design, construction, and operation of engineering networks and equipment.
Area of operated facilities up to 60,000 m².
Completed energy complex projects:
Autonomous energy complex for AGD Diamonds (Arkhangelsk Oblast)
Design of a gas-piston power plant complex with a total installed capacity of 20 MW.
Developed and approved the GPZU. Design of the power generation facility.
Autonomous energy complex for JSC Gazstroyprom (Sakhalin Oblast)
Pre-design solution for a 10 MW gas-piston power plant energy complex.
Energy complex for Gazprom Dobycha Orenburg LLC (Arkhangelsk Oblast)
Project for backup power supply of diesel power stations with an installed capacity of 50 MW, equipment installation, commissioning, preparation of as-built documentation, project management.
Project of a 110 kV transformer substation, construction, project management.
Project for the reconstruction of a 25 MW gas boiler house, including thermal generation, design of electrical/heat/water supply, ventilation, and air conditioning sections. Obtaining technical conditions, project approvals. Equipment installation, commissioning, preparation of as-built documentation.